Istanbul Congress Center / Harbiye
Fire Detection System renovation project of the Istanbul Congress Center has been completed.
Stable operability of the 6000 detectors and other equipment (sirens, modules, etc.) is ensured, in addition to the system, graphics addressing software and hardware have been added.
All projects have been drawn for the implementation and have been processed in the graphics display software. The instructions from the consulting firm for the scenario have been processed, their tests have been performed and they have been delivered.